Here is the Belt Filter Press room after the high-performance interior painting is finished. In this room and the UV room (next picture), the walls currently covered with foil-lined insulation panels will have metal liner panels installed soon-

And the UV room after the epoxy paint has been applied-

The roofers are wrapping up details on ridge caps and soffits-

Here are "during" and "after" shots of the Blower units being bolted up-


And finally a site view taken early in the week before the chem tanks were in place-