Back at Mechanical, most of the interior paint work is done so it's time to hit the doors-
Here is the Belt Filter Press room after the high-performance interior painting is finished. In this room and the UV room (next picture), the walls currently covered with foil-lined insulation panels will have metal liner panels installed soon-
And the UV room after the epoxy paint has been applied-
The roofers are wrapping up details on ridge caps and soffits-
Here are "during" and "after" shots of the Blower units being bolted up-
And finally a site view taken early in the week before the chem tanks were in place-