Monday, April 12, 2010

Week 42, Part 2- Painting, roof & piping

Back at Mechanical, most of the interior paint work is done so it's time to hit the doors-







Here is the Belt Filter Press room after the high-performance interior painting is finished. In this room and the UV room (next picture), the walls currently covered with foil-lined insulation panels will have metal liner panels installed soon-



And the UV room after the epoxy paint has been applied-



The roofers are wrapping up details on ridge caps and soffits-



Here are "during" and "after" shots of the Blower units being bolted up-





And finally a site view taken early in the week before the chem tanks were in place-