Over at Operations All Wall placed insulation and vapor barrier in preparation for drywall-
Here are some stacks of drywall waiting to be used-
Insulation in the mechanical room of Operations-
Then the drywall started going up-
Rod Willard, City of Plummer Public Works Director, has a look at progress in the Operations building-
The Mechanical building in progress as seen from the Trail of the Coeur d’Alene’s-
A view from the southwest including Lift Station 2 (effluent)-
At the end of the week we took a ride on a lift and got this overhead shot of Operations-
And this shot of Mechanical with the plywood sheeting in place, ready for “dry-in” (roofing felt). And that’s all for this week!