Week 16- First PREM wall pour, another at the Treatment Bldg

Last week seemed slow while we prepped for concrete in both buildings, this week the work came to fruition and we had pours Monday and Tuesday!

Here's a wide shot of the whole site on Monday while the Treatment Building was getting its 2nd to last pour-



Here you can see the interior wall forms behind rebar in the Treatment Building, then the concrete wall as the forms are stripped, then the forms going up for the final, exterior wall-







This is a shot of the northwest corner just prior to the pour. The blue pipe carries a hose which is filling completed tanks for leak tests-



Here's the PREM building with upper-level handrails- a catwalk 24 feet above the slab!-



And the pour is underway!- I climbed part way into the hole for some interesting pictures-









They poured an extra lift on the northern part of the floor and the 2nd shot shows the next stage of forms already on the new floor above the slab-





Two shots of the PREM building with interior forms partially stripped from the new south half wall-





And a hilltop view of the Treatment Building with 7 of 10 tanks completely enclosed-