Thursday, October 29, 2009

Week 19, Part 2 PREM finished and overhead views-

The final pour for the PREM building (Phosphorous REMoval) was last week and it took a few days to strip the forms off. Early this week that was wrapped up-






Late in the week I had the chance to get some elevated shots in a Genie lift-
the first is the PREM building, 24 foot walls on top of a slab, 18-20 feet of the walls sit below the original site grade. I left the trucks in the upper right corner for perspective-



This is the Treatment Building with half of it being tested for water leaks at the time of picture-



In the meantime the Wetland Discharge Area has seen step-by-step progress- this week the perforated pipe with gate valves was installed. I'll be back soon with Week 20 update!