Tuesday, January 26, 2010

Week 34, Part 2- Mechanical: Rolling Trusses!

After Owens cleared away some dirt piles, CNI staged the trusses out in front of Mechanical-



And it was time to get rolling!-



I think this was later the same afternoon, this is the southwest corner of Mechanical-



Well, not really the same afternoon, but it did go quickly. This is the southeast corner of Mechanical. The Blower room is the easternmost room, generating low pressure air for the aeration process-



And this is the northwest corner. The open area is where a trailer will back in and haul away sludge pumped from the Belt Filter press in the room to the east-



In that previous picture you see the Genie lift against the north wall. A CNI crew member is gaining access to the north gable wall, securing it to the truss system-





Here is a before and after look at the UV Disinfection room, before and after trusses-





This wide view is from on top a large gravel pile at the west edge of the job, looking due east. Operations is back-left of picture, Treatment is back-right, partially obscured by Mechanical with all the wood trusses in the near-right foreground-



And that's all for this week!