Wednesday, May 12, 2010

Week 46, Part 2

Rick (Challenger) builds a box-mounting rack on the Effluent Lift Station housing-



Paul Sifford, City of Plummer Plant Operator, looks over the work soon after the disconnect boxes were installed on the LS-2 rack-



A closer look at the Reuse Water Tank shows Disconnect and J-boxes on the south wall of Mechanical in the background. The windows up top look into the Belt Filter Press room-



Paul (Challenger) takes a break after helping install the overhead lights in the “Sludge Basin”. Brent is hiding behind the ladder-



CNI’s crew- Orion, Casey and Dennis- finish installing some trim wood under the south gable of Mechanical-



An All Wall painter hits the trim right behind CNI’s crew-



Challenger installed the Mixed Liquor Analyzer this week in the Treatment Basin-



Here’s a wide view of it’s placement on the handrails. The roof of Operations can be seen to the right (north) and the roof of Mechanical is off to the left (west). The Phosphorous Removal tilt-roof is in the center above the handrails-



John and Scott of Challenger are installing the Analyzer and related conduit. There are some tight fits so “precision bending” of rigid conduit is necessary-