This week brought a range of weather conditions and an increase in moisture, occuring as rain, snow and fog.

The excavations aren't quite filled up yet so we see the groundwater rise and fall with each passing rain event-

Now you see it-



Now you don't!



We have a lot of overcast days-



And a lot of foggy mornings-





Installation of "process piping" continues as needed or inbetween other work performed by Owens Construction. We have lines that carry the partially treated waste water from one building to the next, we have air lines to supply the Aero Mod treatement system, a sludge draw-off line from one building and on-site waste water lines that head back to Lift Station-1.





A final comment on the weather- I'll let the pictures do the talking. The following three pictures were all taken this week. We prefer the final one!